Mohali Airport Road to Get Six New Flyovers

Six flyovers proposed on PR-7 to convert Mohali's busiest corridor into a freeway.

Register Interest

Six Flyovers Planned on Mohali Airport Road to Ease Aerocity Corridor Congestion

Mohali's Airport Road, officially designated PR-7, is set for a major infrastructure overhaul. Mohali Municipal Corporation plans to transform Mohali Airport Road into a freeway to ease traffic congestion, with the project involving construction of six flyovers along the 14 km stretch from Kharar to the airport crossing. These flyovers will replace 13 existing traffic intersections that currently choke the corridor during peak hours.

The scale of the problem is well documented locally. A Sector 66-A resident, whose home sits just six kilometres from Shahid Bhagat Singh International Airport, described the situation bluntly: the distance from home to the airport takes 15 to 20 minutes on a good day, but between 6 and 7 most evenings, it literally stops for over an hour, sometimes more, as traffic backs up along the lone approach road to the airport. A parallel plan for six flyovers between Kharar and the airport crossing, meant to convert the stretch into a freeway, remains in its early phases.

GMADA's approach isn't limited to elevated crossings alone. To improve traffic flow on internal roads, the Mohali Municipal Corporation will also build roundabouts at key intersections, with officials emphasizing the need for smooth transit between Kharar and Airport Chowk. The project will be implemented in phases, with a primary focus on constructing the flyovers first. Once complete, elevating traffic at these points aims to create uninterrupted travel paths, easing congestion and improving the driving experience for commuters.

This corridor carries far more than local traffic. Airport Road (PR-7) is the only route available to traffic from both Punjab and Haryana, carrying airport-bound commuters, Aerocity and IT City residents, freight vehicles, Zirakpur and New Chandigarh traffic, and through-traffic heading toward Jammu & Kashmir and Himachal Pradesh — all on one corridor. The stretch runs past institutions that have reshaped Mohali's identity — NIPER, IISER, NABI, STPI, a state medical college and the Indian School of Business, around which has risen an altogether new skyline of IT City, Aerocity, shopping malls, corporate hospitals and high-rises.

GMADA isn't relying on the flyovers alone. A separate, Punjab-funded alternate corridor — the Airport Link Road — is also in the pipeline. Sectors 65 and 66 sit directly along this new alignment and see the most immediate benefit, while Aerocity, Sector 67–70 and IT City gain from improved overall airport access. Once operational, PR-7 will continue operating as the primary corridor, but a meaningful share of traffic will shift to the new alternate route, reducing congestion and improving travel-time reliability on both roads. Separately, the Bharatmala-funded expressway linking IT City Chowk to Ambala is also progressing, with Package 2, the Mohali-Kurali stretch, already functional in December 2025, while Package 1 from IT Chowk to Ambala was proposed to be operational in March-May 2026.

For homebuyers, the timing matters as much as the promise. Real estate along this belt has already priced in a chunk of the upside: built-up flats in Aerocity are running at around Rs 9,153 a square foot now, up roughly 7 percent on the quarter. Institutional appetite is equally telling — the March 2026 GMADA auction saw 37 of 42 properties sell, generating ₹3,136.97 crore and exceeding reserve prices by 55 percent, underscoring institutional confidence in the Aerocity corridor. Over a longer horizon, land rates in Aerocity have appreciated over 400 percent in the past decade, according to data observed on property portals, making it one of the strongest performers in Punjab real estate.

That said, buyers should treat the freeway conversion as a multi-year rollout rather than an imminent fix. The alternative route remains a work in progress; the flyover meant to ease the crush is still a dream for daily commuters today. Anyone evaluating a home or plot along PR-7, Aerocity, or IT City should factor in construction-phase disruption on the road itself before the long-term connectivity gains materialise — a pattern typical of large civic works in fast-growing corridors like this one.

M3M Projects

M3M DUBAI
Upcoming

M3M DUBAI

Dubai, UAE

Configuration TBA • Price on Request

M3M's first international residential project in Dubai

M3M Gurugram 500-Acre Land Bank Expansion
Upcoming

M3M Gurugram 500-Acre Land Bank Expansion

Gurugram & adjoining areas

TBA • Price on request

500-acre land bank, ₹2,500 Cr acquisition

M3M PLOTS KURUKSHETRA
Upcoming

M3M PLOTS KURUKSHETRA

NH-44, Kurukshetra

Residential Plots • Price on Request

Freehold plots on NH-44 corridor

M3M SCO 43
Upcoming

M3M SCO 43

Sector 43, Golf Course Extension Road, Gurugram

SCO Plots, Retail, Office • Rs 2.5 Cr onwards

5.8-acre SCO precinct by Bentel Associates

M3M Sector 83 Gurugram
Upcoming

M3M Sector 83 Gurugram

Sector 83, Gurugram

Retail Shops, Food Court & Office Spaces • Rs 60 Lakh onwards

NH-8 & Dwarka Expressway junction

M3M THE ADDRESS
Upcoming

M3M THE ADDRESS

Sector 94, Noida

3, 4, 5 BHK • Rs 5.90 Cr onwards

Skyline & golf-course facing towers on Noida Expressway

M3M AMBALA
Pre-Launch

M3M AMBALA

Naraingarh, Ambala

2, 3, 4 BHK • Price on Request

On the Ambala-Chandigarh Expressway

M3M APARTMENTS JAMMU
Pre-Launch

M3M APARTMENTS JAMMU

Jammu, Jammu

2.5, 3.5, 4.5 BHK • On Request

50,000 sq ft clubhouse, Tawi River valley views

Connect

Register Your Interest

Back

Specifications & FAQ

What exactly is planned on Mohali Airport Road?
The Mohali Municipal Corporation is planning to convert the 14 km stretch of PR-7 (Airport Road) between Kharar and the airport crossing into a freeway by building six flyovers over 13 existing traffic intersections.
When will the six flyovers be completed?
As of the latest local reporting, the project remains in its early planning phase with no confirmed completion date. Construction will happen in phases, with flyovers prioritized first before internal road and roundabout works.
Which areas will benefit most from this project?
Aerocity, IT City, Sector 66-A and 67, and the broader Kharar-to-airport belt are expected to see the most direct relief, since PR-7 is currently the only corridor serving airport-bound and cross-border Punjab-Haryana traffic.
Is there an alternate route being built alongside the flyovers?
Yes. GMADA is separately developing an Airport Link Road, a Punjab-funded parallel corridor that will divert a portion of traffic away from PR-7, primarily benefiting Sectors 65 and 66 while easing overall pressure on Airport Road.
How will construction affect daily commute during the project?
Large flyover projects typically cause short-term disruption, lane closures, and diversions during construction. Commuters and prospective buyers should expect temporary inconvenience before the long-term freeway benefits show up.
Will this infrastructure upgrade affect property prices in Aerocity?
Aerocity has already seen strong appreciation, with built-up flat prices around Rs 9,153 per sq ft and a recent GMADA land auction closing 55% above reserve price. Improved connectivity typically reinforces this trend over the medium term.
Is M3M developing a project along this corridor?
M3M has a residential project in Mohali offering 2, 3 and 4 BHK apartments, positioned to benefit from the area's improving connectivity, IT City proximity, and ongoing Airport Road infrastructure upgrades.
What other road projects are improving connectivity in this belt?
Beyond the six flyovers, a Bharatmala-funded six-lane expressway connecting IT City Chowk to Ambala is under construction, with the Mohali-Kurali package already functional and the IT Chowk-Ambala package expected to open in 2026.
Who is funding and executing the flyover project?
The flyover and freeway conversion is being driven by the Mohali Municipal Corporation and GMADA (Greater Mohali Area Development Authority), the state agency responsible for planning and civic infrastructure in the region.
Should homebuyers wait for the flyovers to be completed before buying?
Not necessarily. Infrastructure announcements often get priced into property values early, and Aerocity/Airport Road has already shown steady appreciation ahead of full project completion. Buyers should independently verify current construction timelines before deciding.

Provided for information only. Not an offer, solicitation, or contract. Specifications, pricing, and timelines are subject to change without notice. Verify all data independently prior to any decision. About · Projects