NH-44 Panipat: Widening Work and Smart Traffic Surveillance Underway

NHAI widening and CCTV surveillance are set to decongest Panipat's elevated NH-44 corridor.

Register Interest

NH-44 Widening and Elevated Corridor Decongestion: What It Means for Panipat Homebuyers

Panipat's stretch of NH-44, the Grand Trunk Road connecting Delhi to Amritsar, is undergoing a fresh round of infrastructure upgrades aimed at easing chronic traffic bottlenecks around the city's 10-km elevated expressway. The Panipat Elevated Corridor, built in 2008 as a six-lane access-controlled bypass, was designed to keep highway traffic moving above the city, but congestion at ground level near the elevated stretch has persisted for years.

The National Highways Authority of India (NHAI) has now approved widening of the peripheral service roads running on both sides of the elevated highway within Panipat city limits. According to district officials, the project involves widening these service lanes from 3.5 metres to 5.5 metres, on a budget of roughly Rs 14 crore. The Deputy Commissioner's office has stated that the objective is to decongest the traffic flow on the NH-44 in the city and to provide better facilities to the residents. NHAI's Project Director for the Ambala region confirmed that official formalities were complete and ground work would begin shortly after clearance from GRAP restrictions.

Alongside the physical widening, the Panipat district administration and traffic police are pushing ahead with a long-planned CCTV surveillance rollout to make NH-44 a model road. Police teams had earlier identified over 100 sensitive points across the city for camera installation, and the current plan covers the entire elevated highway zone from the toll plaza to Sewah village. These automatic number-plate-reading cameras are intended to catch speeding, red-light jumping, and wrong-lane driving, with challans issued automatically, according to the traffic DSP overseeing the project.

This local widening initiative builds on the much larger Delhi-Panipat NH-44 upgrade completed in recent years, an 8-lane elevated expressway stretch built by NHAI, which addressed intercity travel speeds along the corridor. However, this project focused on regional connectivity, not the localized congestion inside Panipat town, which is where the current peripheral road and CCTV works come in. Separately, NHAI has previously opened new entry and exit cuts on the elevated stretch, near Malik fuel station and Khadi Ashram Chowk, to give residents more direct access points without diverting through congested chowks like Sanjay Chowk and Red Light Chowk.

For homebuyers and investors tracking Panipat's real estate momentum, these improvements matter directly. Sector 36 and Sector 37, where M3M and other developers have launched residential plots, apartments, and mixed-use projects, sit close to the NH-44 corridor and stand to benefit from smoother last-mile connectivity once the peripheral widening and smart-traffic systems are operational. Reduced congestion around the elevated highway typically translates into shorter commute times to Delhi, Karnal, and Sonepat, and better access for daily errands, both of which are recurring priorities for buyers evaluating townships along this stretch.

While timelines for on-ground completion depend on NHAI's execution pace, the combination of physical road widening and automated traffic enforcement signals a broader push by Haryana authorities to fix Panipat's most persistent infrastructure complaint. Buyers considering projects along Sector 36-37 should track construction milestones on the peripheral road works, as completion will directly affect access routes into these upcoming residential pockets.

M3M Projects

M3M DUBAI
Upcoming

M3M DUBAI

Dubai, UAE

Configuration TBA • Price on Request

M3M's first international residential project in Dubai

M3M Gurugram 500-Acre Land Bank Expansion
Upcoming

M3M Gurugram 500-Acre Land Bank Expansion

Gurugram & adjoining areas

TBA • Price on request

500-acre land bank, ₹2,500 Cr acquisition

M3M PLOTS KURUKSHETRA
Upcoming

M3M PLOTS KURUKSHETRA

NH-44, Kurukshetra

Residential Plots • Price on Request

Freehold plots on NH-44 corridor

M3M SCO 43
Upcoming

M3M SCO 43

Sector 43, Golf Course Extension Road, Gurugram

SCO Plots, Retail, Office • Rs 2.5 Cr onwards

5.8-acre SCO precinct by Bentel Associates

M3M Sector 83 Gurugram
Upcoming

M3M Sector 83 Gurugram

Sector 83, Gurugram

Retail Shops, Food Court & Office Spaces • Rs 60 Lakh onwards

NH-8 & Dwarka Expressway junction

M3M THE ADDRESS
Upcoming

M3M THE ADDRESS

Sector 94, Noida

3, 4, 5 BHK • Rs 5.90 Cr onwards

Skyline & golf-course facing towers on Noida Expressway

M3M AMBALA
Pre-Launch

M3M AMBALA

Naraingarh, Ambala

2, 3, 4 BHK • Price on Request

On the Ambala-Chandigarh Expressway

M3M APARTMENTS JAMMU
Pre-Launch

M3M APARTMENTS JAMMU

Jammu, Jammu

2.5, 3.5, 4.5 BHK • On Request

50,000 sq ft clubhouse, Tawi River valley views

Connect

Register Your Interest

Back

Specifications & FAQ

What is the NH-44 widening project in Panipat?
It is an NHAI-approved plan to widen the peripheral service roads on both sides of Panipat's elevated highway from 3.5 metres to 5.5 metres, aimed at reducing local traffic congestion around the 10-km elevated corridor.
Why was the Panipat elevated corridor built if traffic is still congested?
The elevated corridor, opened in 2008, was meant to let through-traffic bypass the city above ground level. However, congestion persisted at ground-level service lanes and intersections beneath and around the elevated stretch, which the current widening and CCTV projects aim to address.
What role does CCTV surveillance play in this project?
Panipat's traffic police plan to install high-resolution, number-plate-reading cameras across the elevated highway zone to automatically challan violations like speeding, red-light jumping, and wrong-lane driving, helping keep traffic flowing smoothly.
How does this affect connectivity for M3M projects in Panipat?
M3M's residential and mixed-use developments in Sector 36 and 37 are located close to NH-44, so reduced local congestion and improved peripheral roads should mean easier, faster access to and from these projects.
When will the widening work be completed?
NHAI officials indicated work would start shortly after clearance from GRAP restrictions, but a firm completion date has not been publicly confirmed; buyers should track local NHAI and district administration updates for progress.
Is the NH-44 Delhi-Panipat expressway the same as this local widening project?
No. The Delhi-Panipat NH-44 upgrade was a separate, larger 8-lane elevated expressway project focused on intercity travel. The current initiative targets local congestion within Panipat city, around the existing elevated corridor.
Are there new entry and exit points on the elevated highway?
Yes, NHAI has added entry and exit cuts near Malik fuel station and Khadi Ashram Chowk to give residents more direct access to the elevated stretch without routing through congested city chowks.
What is M3M City of Dreams in Panipat?
M3M City of Dreams is a township development in Sector 36-37 Panipat offering residential plots and mixed-use spaces, positioned close to NH-44 for direct highway access.
Will property prices in Panipat rise due to these infrastructure upgrades?
Improved connectivity and reduced congestion typically support property values over time, as they enhance livability and commute convenience, though actual price movement depends on broader market and project-specific factors.

Provided for information only. Not an offer, solicitation, or contract. Specifications, pricing, and timelines are subject to change without notice. Verify all data independently prior to any decision. About · Projects