Jaipur Metro Phase 2 Cleared: 41 km Corridor to Link Airport, Tonk Road, Sitapura

Cabinet approves Rs 13,037 crore metro line connecting Jaipur's airport, industrial hubs and key residential

Register Interest

Published

Jaipur Metro Phase 2 Gets Union Cabinet Nod: What It Means for Homebuyers

The Union Cabinet, chaired by Prime Minister Narendra Modi, has approved the Rs 13,037.66 crore Jaipur Metro Phase-2 project, a transformative 41 km long North–South corridor from Prahladpura to Todi Mod, comprising 36 stations across the city. This marks the biggest single infrastructure push for Jaipur's transit network since the city's first metro line opened, and it directly touches some of the fastest-growing residential and industrial corridors in the Pink City.

The new line will be implemented by Rajasthan Metro Rail Corporation Limited (RMRCL), a 50:50 joint venture of the Centre and the Rajasthan government. Unlike Phase-1, which largely serves the walled city and Mansarovar belt, Phase-2 is built for the city's newer growth zones. The Phase-2 corridor will provide seamless connectivity to major activity nodes such as Sitapura Industrial Area, VKIA, Jaipur Airport, Tonk Road, SMS Hospital and Stadium, Ambabari, and Vidhyadhar Nagar. For residents and investors along Tonk Road and in the Sitapura belt, this is the first time these areas will get dedicated rail-based mass transit.

A notable engineering detail: the corridor includes underground stations in the airport area and will integrate with the operational Phase-1 through planned interchanges and feeder systems, ensuring a unified and continuous metro network across the city. That interchange design matters for daily commuters — it means a resident near Tonk Road or Sitapura will eventually be able to travel across Jaipur, including into the historic Walled City core, without switching to road transport.

Context on scale: Jaipur already has an operational metro system under Phase-1, running along the East–West corridor from Mansarovar to Badi Chaupar, covering 11.64 km with 11 stations, connecting important residential and commercial areas with the Central Business District. At present, Jaipur Metro Phase-1 records an average daily ridership of around 60,000 passengers on the shorter but critical 11.64 km corridor. Phase-2, at nearly four times the route length and more than three times the station count, is expected to significantly change how the city moves — and where people choose to buy homes.

The project has cleared rigorous financial scrutiny. Jaipur Metro Phase-2 has undergone comprehensive appraisal at multiple levels, including Inter-Ministerial Consultation, Network Planning Group review and Public Investment Board evaluation, and its Economic Internal Rate of Return exceeds the 14% threshold set for socio-economic viability. Funding will be structured through equity support from the Centre and Rajasthan government, along with subordinate debt and multilateral financing, in line with the Metro Rail Policy, 2017. The project is targeted for completion by September 2031, giving the market a clear execution timeline to price in.

For homebuyers, the practical takeaway is that Tonk Road, Sitapura, and the airport-adjacent micro-markets — historically valued for their industrial and hospitality presence rather than residential premium — now have a credible, funded transit catalyst. Metro connectivity in Indian cities has consistently correlated with faster appreciation and better rental absorption in the 1-3 km catchment around stations, and Jaipur's Phase-2 stations at Sitapura and Tonk Road are positioned to benefit from exactly this dynamic over the 2026-2031 construction window.

M3M has been expanding its footprint beyond Gurugram, Noida and Panipat, and its upcoming Jaipur launch sits in this same South Jaipur growth corridor near Tonk Road, within the influence zone of the newly approved metro line. Buyers evaluating this project now have a rare window to enter before construction-linked infrastructure premiums build into pricing, a pattern seen in every Indian city where a metro approval preceded a multi-year price re-rating in the connected micro-markets.

M3M Projects

M3M ASTON MARTIN RESIDENCES
Upcoming

M3M ASTON MARTIN RESIDENCES

Sector 111, Gurgaon

5, 5.5 BHK • Rs 30 Cr onwards

Aston Martin branded residences, Dwarka Expressway

M3M DUBAI
Upcoming

M3M DUBAI

Dubai, UAE

Configuration TBA • Price on Request

M3M's first international residential project in Dubai

M3M EIFFEL
Upcoming

M3M EIFFEL

Gurgaon

Configuration on request • Price on request

Upcoming M3M address in Gurgaon

M3M FLOORS SECTOR 63
Upcoming

M3M FLOORS SECTOR 63

Sector 63, Gurgaon

2.5, 3, 3.5 BHK • Price on Request

Low-rise independent floors next to Golf Course Road

M3M Greater Southern Peripheral Road
Upcoming

M3M Greater Southern Peripheral Road

Greater Southern Peripheral Road, Gurugram

2, 3, 4 BHK • Price on Request

Upcoming mixed-use development

M3M HILL LIVING
Upcoming

M3M HILL LIVING

Sector 79, Gurgaon

2.5, 3.5 BHK • Rs 1 Cr onwards

40-45 acre low-rise hill township

M3M LOW RISE FLOORS
Upcoming

M3M LOW RISE FLOORS

Sector 61, Gurgaon

2, 2.5, 3.5 BHK • Rs 2.4 Cr onwards

25-acre low-rise township on Golf Course Ext Road

M3M PLOTS SECTOR 79
Upcoming

M3M PLOTS SECTOR 79

Sector 79, Gurgaon

Residential plots • Price on request

Gated plotted development near NH-48

Connect

Register Your Interest

Back

Places in this story: Jaipur city guide · Gurugram city guide · Noida city guide

Specifications & FAQ

What exactly did the Cabinet approve for Jaipur Metro Phase 2?
The Union Cabinet approved a 41 km North–South metro corridor from Prahladpura to Todi Mod with 36 stations, at a total project cost of Rs 13,037.66 crore, to be built by Rajasthan Metro Rail Corporation Limited.
Which areas will Jaipur Metro Phase 2 connect?
The corridor will connect Sitapura Industrial Area, VKIA, Jaipur Airport, Tonk Road, SMS Hospital and Stadium, Ambabari and Vidhyadhar Nagar, covering both industrial and residential zones across the city.
When will Jaipur Metro Phase 2 be completed?
The project is targeted for completion by September 2031, according to the Cabinet's approval timeline.
Will Phase 2 connect with the existing Jaipur Metro line?
Yes, it includes underground stations near the airport and will integrate with the operational Phase-1 East–West corridor through planned interchanges and feeder systems, creating one connected network.
How is Jaipur Metro Phase 2 being funded?
Funding will come from equity contributed by the Centre and Rajasthan government, subordinate debt, and multilateral financing, structured under the Metro Rail Policy, 2017.
How does this metro approval affect property prices near Tonk Road and Sitapura?
Areas gaining direct metro access typically see stronger long-term price appreciation and rental demand as construction progresses; Tonk Road and Sitapura are now directly on the approved Phase-2 alignment.
Is there an M3M project near this upcoming metro corridor?
M3M has an upcoming residential launch positioned in South Jaipur near the Tonk Road belt, placing it within the catchment of the newly approved metro line.
What is the current ridership on Jaipur's existing metro line?
Jaipur Metro Phase-1 currently records an average daily ridership of around 60,000 passengers on its 11.64 km Mansarovar–Badi Chaupar corridor.
Who is implementing the Jaipur Metro Phase 2 project?
Rajasthan Metro Rail Corporation Limited (RMRCL), a 50:50 joint venture between the Government of India and the Government of Rajasthan, will implement the project.
Does Phase 2 include underground sections?
Yes, the corridor includes underground stations in the airport area to minimise surface disruption near Jaipur International Airport.

Provided for information only. Not an offer, solicitation, or contract. Specifications, pricing, and timelines are subject to change without notice. Verify all data independently prior to any decision. About · Projects