Ghaziabad-Jewar RRTS: The Corridor That Connects NCR to Its New Airport

72 km rapid rail to link Ghaziabad, Noida, Greater Noida and Jewar Airport.

Register Interest

Ghaziabad-Jewar RRTS Corridor: How It Will Connect Noida, Greater Noida and Jewar Airport

The Ghaziabad-Jewar RRTS corridor is set to become one of the most consequential infrastructure links in the National Capital Region, tying together Ghaziabad, Noida, Greater Noida and the newly operational Jewar Airport on a single high-speed rail spine. Planned by the National Capital Region Transport Corporation (NCRTC), the line is a proposed 72 km semi-high-speed rail corridor with 12 stations planned to connect Ghaziabad, Greater Noida and Jewar Airport as part of Delhi's RRTS network. Its northern end will meet the existing Ghaziabad RRTS station on the Delhi-Meerut line, while the southern terminus will sit at Jewar International Airport, currently being built by Tata Projects for operator Flughafen Zurich AG.

The corridor is planned in two construction phases. The line is planned in two phases: Ghaziabad-Kasna with seven stations, and Kasna-Jewar Airport with four, threading the Yamuna Expressway industrial and institutional development. Along the way, the alignment is designed to pass through some of the region's fastest-changing pockets, cutting through corridors including Greater Noida West, Surajpur, Pari Chowk, and the developing YEIDA City, with key nodes at Siddharth Vihar, Char Murti Chowk, Knowledge Park, Kasna and Dankaur before entering the YEIDA sectors and finally the airport terminal.

On approvals, NCRTC's Detailed Project Report was submitted to YEIDA in April 2024, following in-principle approval from the Uttar Pradesh government in December 2023. The project hit a procedural hurdle when the Union Ministry of Housing and Urban Affairs directed in December 2025 that the alignment be reconsidered with Sarai Kale Khan in Delhi as the preferred starting point rather than Ghaziabad, prompting NCRTC to prepare a revised feasibility report. That uncertainty has since been resolved in favour of the original plan: YEIDA officials have confirmed that the Ghaziabad-Jewar rapid rail project will continue along the originally planned route, starting from the Ghaziabad RRTS station and extending through Greater Noida West up to Jewar. Construction is expected to begin between 2026 and 2027, with Phase 1 (Ghaziabad-Kasna) targeted for completion by 2027, though the full corridor's overall project deadline extends to 2041.

Once built, the line will not stand alone. It links directly to the Delhi-Meerut RRTS at Ghaziabad, stitching together a continuous rapid-transit spine that would eventually run from Modipuram in Meerut all the way to Jewar Airport. Separately, NCRTC has also proposed a Rs 15,000-crore RRTS line linking Gurugram and Faridabad with Noida and Greater Noida; that corridor is planned to merge with the Ghaziabad-Jewar line at Surajpur, further widening the airport's rail catchment across Haryana and western UP.

The urgency behind this corridor has grown sharper because the airport it serves is now a reality, not a plan on paper. Noida International Airport (IATA: DXN) was inaugurated on March 28, 2026, by Prime Minister Narendra Modi, with commercial flight operations commencing on June 15, 2026, as announced by operator Yamuna International Airport Private Limited. Yet at launch, the airport has no metro or RRTS connectivity, with all passenger access currently routed via the Yamuna Expressway and connecting roads only, underscoring exactly why the RRTS link matters for the region's daily commuters and long-term growth.

For homebuyers and investors, transit projects of this scale tend to reshape demand patterns well before the first train runs. Areas like Greater Noida West, Pari Chowk, and the YEIDA sectors have emerged as new investment hotspots, and the airport is expected to amplify this demand further as commercial hubs, retail zones, and residential clusters develop along the alignment. On the connectivity front, once operational, the broader RapidX network is expected to cut cross-city travel sharply: NCRTC's plans for the corridor project journeys of around 32 minutes on rapid rail services and 50 minutes on standard services between Ghaziabad and Noida airport, a dramatic improvement over current road-only access.

For buyers evaluating homes along the Noida-Greater Noida Expressway and the Yamuna Expressway belt, the RRTS corridor is a long-horizon catalyst rather than an immediate amenity. M3M's residential developments positioned along this stretch, including its Yamuna Expressway project in Greater Noida and its expressway-facing developments in Noida, sit within the influence zone of this planned network, giving early buyers a stake in a corridor that is being built ahead of demand to capture the next decade of airport-led growth.

M3M Projects

M3M DUBAI
Upcoming

M3M DUBAI

Dubai, UAE

Configuration TBA • Price on Request

M3M's first international residential project in Dubai

M3M Gurugram 500-Acre Land Bank Expansion
Upcoming

M3M Gurugram 500-Acre Land Bank Expansion

Gurugram & adjoining areas

TBA • Price on request

500-acre land bank, ₹2,500 Cr acquisition

M3M PLOTS KURUKSHETRA
Upcoming

M3M PLOTS KURUKSHETRA

NH-44, Kurukshetra

Residential Plots • Price on Request

Freehold plots on NH-44 corridor

M3M SCO 43
Upcoming

M3M SCO 43

Sector 43, Golf Course Extension Road, Gurugram

SCO Plots, Retail, Office • Rs 2.5 Cr onwards

5.8-acre SCO precinct by Bentel Associates

M3M Sector 83 Gurugram
Upcoming

M3M Sector 83 Gurugram

Sector 83, Gurugram

Retail Shops, Food Court & Office Spaces • Rs 60 Lakh onwards

NH-8 & Dwarka Expressway junction

M3M THE ADDRESS
Upcoming

M3M THE ADDRESS

Sector 94, Noida

3, 4, 5 BHK • Rs 5.90 Cr onwards

Skyline & golf-course facing towers on Noida Expressway

M3M AMBALA
Pre-Launch

M3M AMBALA

Naraingarh, Ambala

2, 3, 4 BHK • Price on Request

On the Ambala-Chandigarh Expressway

M3M APARTMENTS JAMMU
Pre-Launch

M3M APARTMENTS JAMMU

Jammu, Jammu

2.5, 3.5, 4.5 BHK • On Request

50,000 sq ft clubhouse, Tawi River valley views

Connect

Register Your Interest

Back

Specifications & FAQ

What is the Ghaziabad-Jewar RRTS corridor?
It is a proposed 72 km semi-high-speed Regional Rapid Transit System (RRTS) line planned by NCRTC to connect Ghaziabad, Greater Noida and Jewar Airport, forming a southward extension of the Delhi-Meerut Namo Bharat network.
How many stations will the corridor have?
The corridor is planned with 12 RRTS stations across two phases: seven stations between Ghaziabad and Kasna, and four more between Kasna and Jewar Airport. Some plans also envision additional local/metro-style stations alongside the RRTS stops.
Which areas will the RRTS line pass through?
The alignment runs through Siddharth Vihar, Char Murti Chowk, Greater Noida West, Surajpur, Pari Chowk, Knowledge Park, the Kasna industrial belt, Dankaur, and the YEIDA sectors before reaching the airport terminal.
When will the Ghaziabad-Jewar RRTS be completed?
Phase 1 (Ghaziabad-Kasna) is targeted for completion by 2027, while the overall project has a broader deadline extending to 2041. Construction is expected to begin between 2026 and 2027, subject to final approvals.
Is Jewar Airport currently connected by any rail transit?
No. At launch, the airport has no metro or RRTS connectivity, with all passenger access currently via the Yamuna Expressway and connecting roads only.
Was there any change in the proposed route?
Yes. In December 2025 the Union Ministry of Housing and Urban Affairs suggested rerouting the line via Sarai Kale Khan in Delhi, but YEIDA has since confirmed the corridor will proceed on its originally planned Ghaziabad-based alignment.
How will this corridor connect to the rest of NCR's rail network?
It links directly to the Delhi-Meerut RRTS at Ghaziabad, creating a continuous transit spine from Meerut to Jewar Airport. A separate proposed Gurugram-Faridabad-Noida-Greater Noida RRTS line is also planned to merge with it at Surajpur.
Has Noida International Airport actually started operating?
Yes. The airport was inaugurated on March 28, 2026, by the Prime Minister, and commercial flight operations began on June 15, 2026.
Why does this corridor matter for property buyers near Yamuna Expressway?
Transit corridors of this scale typically drive demand well ahead of completion. Greater Noida West, Pari Chowk and YEIDA sectors are already emerging as investment hotspots due to the combined pull of the airport and the planned RRTS link.
How much time will the RRTS save between Ghaziabad and the airport?
Based on current NCRTC planning, the journey between Ghaziabad and Noida airport is projected to take around 32 minutes on rapid services and about 50 minutes on standard services once the line is operational.

Provided for information only. Not an offer, solicitation, or contract. Specifications, pricing, and timelines are subject to change without notice. Verify all data independently prior to any decision. About · Projects